The scope of work for Bess Concrete included;
Included in Bess Concrete's scope of works was the construction of approximately 18,800m2 of production floors comprising of complex falls and cross-falls. The production floors were constructed in 223 pours.
Part of the production floors included the forming and pouring of approximately 3,800m of concrete hob/upstands, ranging in size from 200mm high to 450mm high.
Some interesting quantities that increased the complexity of the project included:
- 650 plus bollard plates to be cast into the concrete slabs
- 2,190m of cast in metal angles
- 250m of grated drains
- 930m2 of Mastertop 105 Surface Hardener applied at 2kgs per m2
Also forming part of Bess Concrete's contract was the concrete works to the two-storey Administration Building, including concrete stairs and concrete columns.
|